en Language
    no informain

Preparatory Work Before Starting the Automatic Horizontal Baler Machine

2025-10-16 Leave a message

Equipment Status Inspection

  • Inspect condition of all core components before startup
  • Check hydraulic system for proper oil level and clarity
  • Verify hydraulic lines and joints are secure and leak-free
  • Examine compression cylinder, ram, and guide rails for damage
  • Test control system functionality after powering on
  • Confirm operation panel indicators and displays are responsive

Materials and Consumables

  • Pre-process materials to remove damaging hard objects
  • Ensure material moisture content meets requirements
  • Check sufficient supply of strapping materials
  • Verify strapping mechanism has adequate supplies
  • Refill lubrication points for smooth operation

Safety Measures

  • Verify effectiveness of all safety devices and interlocks
  • Test safety locks on hopper doors for sensitivity
  • Confirm shutdown triggers when doors are not closed
  • Check emergency stop button functionality
  • Clear obstructions around equipment
  • Define safe operating areas free of personnel and debris

Environment and Parameters

  • Ensure operating environment has flat, dry surface
  • Verify adequate ventilation to prevent moisture issues
  • Allow ample operating space if near other machinery
  • Preset control system parameters based on material
  • Adjust compression pressure and bundle count
  • Calibrate fill height thresholds to prevent overload