Metal Shear Pre-Operation Safety Inspection
Before starting metal shear equipment, conduct comprehensive safety inspections from both mechanical and electrical aspects to ensure stable operation and personnel safety.
Safety Inspection Checklist
-
Mechanical Inspection
Blade Condition: Verify secure installation, proper alignment, and check for wear/cracksBlade Gap: Confirm adjustment matches material thickness requirementsTransmission Components: Inspect belts, chains, couplings for wear/breakageProtective Guards: Ensure all are properly installed and undamagedHydraulic System (if applicable): Check oil level/quality, inspect for leaksFasteners: Verify all bolts/nuts are properly tightened
-
Electrical Inspection
Power Connections
Check terminals for tightness/oxidationGrounding
Verify reliable connection (≤4Ω)Control Panel: Test all buttons/indicators for proper functionEmergency Stop: Must immediately cut power when pressedLimit Switches: Test proper triggering responseElectrical Cabinet: Inspect for exposed wires, verify protective components
Complete all inspection items systematically before operation. Critical safety components (marked in red) require special attention. Never operate equipment until all safety checks are satisfactorily completed and any identified issues are properly addressed.