en Language
    no informain

What inspections need to be completed before starting Metal Shear

2025-06-20 Leave a message

Metal Shear Pre-Operation Safety Inspection

Before starting metal shear equipment, conduct comprehensive safety inspections from both mechanical and electrical aspects to ensure stable operation and personnel safety.

Safety Inspection Checklist

  • M
    Mechanical Inspection
    Blade Condition: Verify secure installation, proper alignment, and check for wear/cracks
    Blade Gap: Confirm adjustment matches material thickness requirements
    Transmission Components: Inspect belts, chains, couplings for wear/breakage
    Protective Guards: Ensure all are properly installed and undamaged
    Hydraulic System (if applicable): Check oil level/quality, inspect for leaks
    Fasteners: Verify all bolts/nuts are properly tightened
  • E
    Electrical Inspection
    Power Connections
    Check terminals for tightness/oxidation
    Grounding
    Verify reliable connection (≤4Ω)
    Control Panel: Test all buttons/indicators for proper function
    Emergency Stop: Must immediately cut power when pressed
    Limit Switches: Test proper triggering response
    Electrical Cabinet: Inspect for exposed wires, verify protective components

Complete all inspection items systematically before operation. Critical safety components (marked in red) require special attention. Never operate equipment until all safety checks are satisfactorily completed and any identified issues are properly addressed.