How to use Metal Shear

2025-06-21 Leave a message

Metal Shear Idle Time Impact Analysis

The idle time of metal shears refers to non-productive movement between cutting operations, significantly affecting efficiency through time loss, energy waste, and production bottlenecks.

  • Time Loss: Idle time accounts for 35%-50% of cycle time in mechanical shears and 20%-35% in hydraulic models. A hydraulic shear with 8-second cycle (40% idle) loses 3.2 hours daily. Optimization can reduce idle to 2 seconds, boosting capacity by 33%.
  • Energy Cost: Idle operation consumes 25%-35% of rated power. A 100kW machine wastes 80-120kWh daily. Accumulators or VFDs can cut consumption by 15%-25%.
  • Production Coordination: In automated lines, 2-second idle time wastes 32 meters of material processing per hour. Synchronized feeding or multi-station operations can increase line speed by 15%-20%.
Optimization Example: Servo-driven shears with 2-second idle time (6-second total cycle) processing 5,760 cuts/day vs hydraulic models' 3,600, demonstrating 60% productivity gain.
Key Solutions: Implement servo drives for faster repositioning, hydraulic accumulators to reduce pump idling, and synchronized automation to eliminate material waiting time - collectively improving efficiency by 30-40%.