Equipment Pre-Operation Inspection Checklist
Comprehensive guidelines for ensuring equipment safety and operational readiness
1
Machine Structure and Connection Inspection
- Comprehensively inspect machine fixation, ensuring the frame is securely connected to the ground
- Check connection status of cutter shaft, cutters, and transmission components
- Ensure cutters are firmly installed without deformation or damage
- Verify cutter shaft rotates freely without jamming
- Clean residual material and debris from feed inlet, shredding chamber, and discharge channel
- Inspect seals at all machine joints for integrity to prevent material leakage
2
Safety Protection Device Inspection
- Focus on inspecting safety protection facilities including guardrails and safety doors
- Confirm trigger-type safety interlock devices are functioning correctly
- Test emergency stop button responsiveness to ensure quick power cutoff
- Check operator work area is free of obstructions with clearly visible warning signs
- Verify safety equipment such as protective gloves and goggles are complete and in good condition
3
Electrical and Hydraulic System Inspection
- Inspect electrical control system for damaged or aged wiring insulation
- Check tight connections, clear control panel displays, and normal button response
- Verify hydraulic system oil level and quality with no leaks
- Ensure hydraulic lines are unobstructed and functioning properly
- Test wiring of motors, pumps, and other power components for secure connections
- Confirm reliable grounding protection to prevent short circuits or power failures
4
Material and Environmental Preparation Inspection
- Verify materials have undergone pretreatment with hard foreign objects separated
- Ensure material properties are suitable for equipment's processing capacity
- Confirm no excessively large or hard materials are present
- Check working environment is clean, dry, and well-ventilated
- Verify absence of flammable, explosive, or other hazardous materials
- Ensure no unauthorized personnel present with sufficient working space