en Language
    no informain

How to start Alligator Hydraulic Shear Machine

2025-10-24 Leave a message

Pre-Start Safety and Equipment Inspection

Before beginning operation, conduct thorough safety and equipment checks to prevent malfunctions or accidents.

Visual Inspection

Examine the entire machine visually:

  • Check the shear blade for damage like cracks or dull edges
  • Inspect hydraulic hoses and connections for leaks
  • Verify safety guards are properly installed and secured

Power Source Preparation

  • Electric models: Ensure stable power supply and check for worn wiring
  • Diesel models: Check fuel levels and engine oil
  • Turn on main power switch or start diesel engine
  • Wait for control panel lights to illuminate

Hydraulic System Priming and Check

  • Activate hydraulic pump to circulate oil
  • This warms the oil and ensures consistent pressure
  • Observe pressure gauge for normal readings
  • If abnormal pressure, shut down and inspect

Test Run Without Load

  • Use controls to move shear blade up and down
  • Verify smooth blade movement and control response
  • Listen for unusual noises indicating mechanical issues
  • Once confirmed functional, machine is ready for materials
Note: Always follow manufacturer's specific guidelines and wear appropriate personal protective equipment during operation.